Attest Know-how

Decision 13 inside your SAP: from requirement to a specification your team can build

A knowledge partnership for the procure-to-pay process of the UAE entities: discovery, functional gap assessment, a specification development kit with test cases, and a conformance review.

Prepared for the Group Finance leadership of RAK Ceramics, UAE entities
1 November 2026 · Confidential, for RAK Ceramics
Attest, a platform by TCA, powered by Suntech
Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.

Contents

Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.Contents2 / 21

From 1 October 2026 the group must be able to show that each supplier and each supply was verified before input tax is deducted

1 The law

Decision 13 of 2026

  • Applies to taxable persons, to supplies received, before input tax is deducted (Art. 2)
  • In force from 1 October 2026 (Art. 7)
2 The duty

Verify, document, keep

  • Verify the supplier (Art. 3) and each supply (Art. 4)
  • At first dealing, and again if not verified in the previous 12 months (Art. 5(1))
  • Document the steps and keep the records (Art. 5(3)); keep a written policy (Art. 5(4))
3 The consequence

VAT Decree-Law Art. 54(bis)

  • Added by Federal Decree-Law No. 16 of 2025
  • The Authority may reject a deduction where the person should have been aware that the supply was part of a tax-evasion chain
  • A person who did not verify as the Authority prescribes is treated as required to be aware (54(bis)(3))
We say what the law says. What the Authority decides in a given case is for the Authority; our aim is that your claims rest on verification and records you can show.
Sources: FTA Decision No. 13 of 2026, Arts. 2, 5, 7; VAT Decree-Law No. 8 of 2017, Art. 54(bis) (added by Federal Decree-Law No. 16 of 2025). Unofficial English translation; the Arabic Gazette text controls.
Go deeper (full deck): 1.1
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›3 / 21

Scope and the test question: UAE entities, each supplier and each supply, and one claim to trace

Scope

  • The UAE entities of the group; goods and services; existing and new suppliers
  • Entities abroad, sales and other regimes are outside this work
  • Entity list confirmed in discovery

The test question

What would you show the Federal Tax Authority today for one input VAT claim, from the supplier to the payment, and how long would it take to assemble?

Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); VAT Decree-Law No. 8 of 2017 as amended.
Go deeper (full deck): 1.3 1.4
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›4 / 21

We group the 27 obligations into nine checks, and every clause sits on at least one

L01 Identity
Art. 3(1)
Is the supplier who it says it is? Individual: ID, and met before the supply. Company: incorporation and representative ID.
L02 Place of business
Art. 3(2)
Is there an actual place of business, confirmed electronically or by a visit, and does it fit the supplier's activity?
L03 Risk indicators
Art. 3(3)
Any red flag in 12 months: address or key people changed more than twice, or disproportionate transactions? If so, an explanation is kept.
L04 Enhanced check
Art. 3(4)
Above AED 375,000 in the past 12 months or expected in the next 12: bank confirmation, and public reviews with no sign of tax evasion?
L05 General assessment and payment terms
Art. 4(1), 4(2)(a)
Is there a genuine commercial reason, and are the payment terms justified, including any third party or foreign account?
L06 Payment method
Art. 4(2)(b)
Is payment electronic? Cash only with a documented reason, within legal limits, and easily verifiable.
L07 Circumstances of supply
Art. 4(3)
Do price, licensed activity, origin and ownership of goods, and any intermediary role stand up?
L08 Timing, records and policy
Art. 5
Verified at first dealing or within 12 months, each supply checked, records kept, and a written policy in place?
L09 Small-supply exception (optional)
Art. 6
Under AED 10,000 excluding VAT, unless the supplier total is or will be above AED 100,000 in 12 months.
Nine is Attest's grouping of Articles 3 to 6. Maker and checker is our control design; the Decision asks for a written policy naming the persons in charge (Art. 5(4)).
Go deeper (full deck): 2.2
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›5 / 21

Procedure, records and three thresholds: when to verify, how to prove it, and how much

First dealingVerify the supplier (5(1))
Each supplyVerify the supply (5(2))
12 monthsRenew if not verified (5(1))
RecordsDocument and keep (5(3))
PolicyPersons in charge (5(4))
Art. 6(1)

AED 10,000 per supply

May be disregarded; a policy choice

Art. 6(2)

AED 100,000 per supplier

Past 12 months or expected over the next 12: the exception does not apply

Art. 3(4)

AED 375,000 per supplier

Past or expected: bank confirmation and public reviews

Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); VAT Decree-Law No. 8 of 2017 as amended.
Go deeper (full deck): 2.5 2.6
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›6 / 21

The cycle on one page: 30 steps, 20 touched by Decision 13, 10 not

Decision 13 adds a controlDecision 13 adapts a stepNo direct impact

7 steps where Decision 13 adds a control

Master data governance, vendor creation, PO release, invoice verification, blocks and release, the VAT return, evidence storage.

13 steps where it adapts what you do

Discovery, onboarding documents, contract, PO creation and amendment, receipts, invoice capture, tax posting, payments, archiving.

10 steps with no direct impact

Requisition, sourcing, info records, budget check, PO output, confirmation, remittance, clearing, period-end, closure. You know these as they are.

Click any box to go to its slide. Each step slide shows what happens in standard SAP, what Decision 13 impacts, and what changes, for new and for existing suppliers.
Standard SAP ECC 6.0 procure-to-pay (verified reference), read against Decision 13. Companion systems (supplier portal, master data governance, GRC) are shown 'if present in your landscape'.
Go deeper (full deck): 3.1
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›7 / 21

Stage A: supplier discovery, onboarding, master data and vendor creation

StepIn standard SAPWhat Decision 13 impactsWhat changes
1 Discovery and registrationSupplier portal (SRM or Ariba, if present); vendor requestedFirst dealing starts verification (Art. 5(1))Capture needed data; record date of first dealing
2 Onboarding documentsKYC documents in portal or on the vendor through GOS or ArchiveLinkIdentity, place, risk, large-supplier evidence (Art. 3)Checklist by supplier type; documents linked to the vendor
3 Master data governanceMDG-S workflow: request, approve, activate (if present)No activation before verification (Art. 5(1))Status, date and class in the request; activation rule; change re-checks
4 Vendor creationXK01 and XK02; LFA1, LFB1, LFM1, LFBK; change documents CDHDR, CDPOS12-month change counts, bank, payee, last verification (Art. 3, 4(2)(a), 5(1))Status, date, class on the vendor; change report; payment block until verified
SAP: verified reference. New suppliers: verified before activation. Existing suppliers: verified in waves.
Go deeper (full deck): 3.2 3.3 3.4 3.5
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›8 / 21

Stage B: contract, purchase order creation, release and amendment

StepIn standard SAPWhat Decision 13 impactsWhat changes
6 ContractME31K; EKKO, EKPO, EKAB'Expected' value over 12 months (Art. 3(4), 6(2)); commercial reasonContract value feeds expected spend per supplier (our reading, agreed with your tax owner)
9 PO creationME21N; EKKO, EKPO, EKKN; tax code MWSKZCommercial reason, price, activity, class, verification in date (Art. 4(1), 4(3)(a), (b), 5(1), 6)Verification and threshold check; reason and benchmark on the PO
10 PO releaseRelease strategy: T16FG, T16FC, T16FV, T16FS, T16FW; CDHDR, CDPOSFlags need concurrence; who may concur is policy (Art. 4, 3(3)(a)(3), 5(4))Decision 13 release step; tax concurrence role; record of who and why
14 PO amendmentME22N; change documents; re-releaseSupplier, bank or value change (Art. 4(2)(a), 6)Re-release on supplier, bank, value or terms change
SAP: verified reference. Steps with no direct impact in this stage are on Stage F.
Go deeper (full deck): 3.6 3.8 3.9 3.11
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›9 / 21

Stage C: goods and service receipt and invoice capture

StepIn standard SAPWhat Decision 13 impactsWhat changes
15, 16 Goods receipt and qualityMIGO (101); MKPF, MSEG; QALS, QA11Origin and authenticity; right to dispose (Art. 4(3)(c), (b))Delivery and origin evidence for flagged items; quality result kept
17 Service entryService PO (ESUH, ESLL); service entry sheet ESSRWithin licensed activity; evidence the service was rendered (Art. 4(3)(b), 5(3))Acceptance evidence for flagged services
18 Invoice capture and parkingScan, OCR, email, EDI, RPA; MIR7; BUS2081 through ArchiveLinkImage linked to the verification record; every path through the same gate (Art. 5(2), 5(3))The same status check on every entry path
SAP: verified reference.
Go deeper (full deck): 3.12 3.13 3.14
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›10 / 21

Stage D: invoice verification, tax posting and blocks

StepIn standard SAPWhat Decision 13 impactsWhat changes
19 Invoice verificationMIRO; RBKP, RSEG; tolerance T169G; duplicate check T169PThe match proves quantity and price, not verification (Art. 5(2))Completeness check at MIRO; if incomplete, post blocked, not rejected
20 Liability and tax postingVendor, GR/IR (WRX), input tax (VST), BSETDeduction follows verification (VAT Law Art. 54(bis)(3); Art. 2)Verification status on every tax line
21 Blocks and releaseRSEG-SPGRS, RBKP-ZLSPR; MRBR; MR11Unresolved flag keeps the item blocked (Art. 5(2), 3(3)(b))Block reason 'Decision 13 pending'; release by authorised role with reason
SAP: verified reference. The UAE VAT set-up is confirmed in discovery.
Go deeper (full deck): 3.15 3.16 3.17
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›11 / 21

Stage E: payment and the VAT return

StepIn standard SAPWhat Decision 13 impactsWhat changes
22 Payment runF110; REGUH, REGUP, PAYR; FBZP; block key ZLSPRThird party, foreign account, changed bank details; electronic payment (Art. 4(2))Proposal excludes blocked items; bank change and third-party triggers; supplier finance documented
23 Manual payment and cashF-53, F-58Cash only with documented reason, within thresholds (Art. 4(2)(b))Tax concurrence for any cash payment
27 VAT returnBSET; S_ALR_87012357; RFUMSV00 (UAE set-up to confirm)A file per claim; deduct only where complete (Art. 5(3); Art. 54(bis)(3))Claims by status; evidence file per claim; held claims carried forward
SAP: verified reference.
Go deeper (full deck): 3.18 3.19 3.20
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›12 / 21

Stage F: evidence storage and archiving, and the steps with no direct impact

StepIn standard SAPWhat Decision 13 impactsWhat changes
29, 30 Evidence storage and archivingGOS, ArchiveLink (TOA01 to TOA03); SARA with MM_EKKO, MM_MATBEL, MM_REBEL, FI_DOCUMNTRetain records so the Authority can verify (Art. 5(3)); no period statedArchiving aligned with the retention period; links survive archiving
No direct impact, as you know them: info record and source list, requisition, sourcing and RFQ, budget check, PO output, confirmation and ASN, remittance advice, GR/IR clearing, period-end, and closure of orders and contracts (steps 5, 7, 8, 11, 12, 13, 24, 25, 26, 28). One watch point: an unverified supplier chosen in sourcing goes to verification before the PO; closure and archiving must not remove evidence early.
SAP: verified reference.
Go deeper (full deck): 3.21 3.7 3.10 3.22
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›13 / 21

New and existing suppliers: one rule, two journeys

New suppliers

Verified before the first dealing

  • Register, submit documents, verify by supplier type, concur on flags
  • Activate the vendor only when complete or explained
  • First PO with the supply checks; evidence file from day one
Existing suppliers

Verified in waves, then kept current

  • Classify the vendor master; triage by threshold class; verify in waves
  • Open orders and invoices go through the gate; supplies since 1 October assessed and documented (agreed with your tax owner)
  • Steady state: 12-month renewal; re-check on address, bank or key-person change
Verified suppliers carry on as before. The new step appears only where verification is missing, expired or flagged.
Law: Decision 13, Art. 5(1). Proposed approach, confirmed in discovery.
Go deeper (full deck): 4.1 4.2 4.3 4.4
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›14 / 21

The changes fall into eight areas of your SAP flow

AreaChangeLikely typeOwner
Vendor master and onboardingVerification status, date, class; document checklist; payment block until verifiedConfiguration and a small enhancementMaster data, procurement
Master data governanceActivation rule; change re-checksWorkflow configurationMaster data
PO creation and releaseThreshold and verification check; Decision 13 release step; concurrence roleConfiguration (release strategy) and a checkProcurement, finance, tax
Goods and service receiptEvidence for flagged itemsProcess and attachmentReceiving, quality
Invoice capture and verificationCompleteness check; new block reason; same gate on automated pathsConfiguration and an enhancementAccounts payable
Blocks and paymentPayment proposal excludes blocked items; bank change and third-party triggersConfiguration and a reportTreasury, AP
VAT return and reviewClaims by status; evidence file per claimReport and processTax
Evidence storage and archivingRetention rules; links survive archivingConfiguration and processBasis, finance
Likely types are confirmed in the specification once your configuration is known. No effort figures are given here.
Go deeper (full deck): 5.1
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›15 / 21

The evidence file per claim: what is in it and where each item is stored

Part of the fileWhat it holdsWhere it comes from
Supplier verification (Art. 3)Identity, place of business, risk and explanation, bank confirmation and public reviews for large suppliersVendor object: attachments, verification record
Supply verification (Art. 4)Commercial reason, payment terms, price, activity, goods origin, intermediary explanationPO, receipt, invoice and their attachments
Procedure record (Art. 5)Date of verification, each supply verified, who and whenVerification record, change documents
Payment recordMethod, bank, third-party or cash explanationPayment documents and tables
Policy (Art. 5(4))Persons in charge, powers, designated storage locationWritten policy, held once
One index per claim, assembled from what SAP already holds plus the Decision 13 records.
Our proposed file structure. Law: Decision 13, Art. 5(3) and 5(4).
Go deeper (full deck): 5.2
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›16 / 21

Four services take you from 'what does Decision 13 mean for us' to 'it was built as specified'

1 DiscoveryHow your process really runs
2 Functional gap assessmentEach clause against what you have
3 Specification development kitEverything your IT team needs, with tests
4 Conformance reviewBuilt as specified, and passing

Each output feeds the next

The as-is map feeds the gap assessment; the gap assessment feeds the specification; the specification and tests feed the conformance review.

Your team builds

Your SAP team or partner builds inside your system. We interpret, specify, test and review. Nothing leaves your system.

Services of Attest Know-how. No dates or fees on this slide.
Go deeper (full deck): 6.1
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›17 / 21

What each service delivers

1 Discovery

As-is map

  • Sessions with tax, finance, procurement, SAP, Basis
  • Read-only walk-through of real screens
  • Unknowns and decisions listed
2 Gap assessment

Gap report

  • 27 clauses against what you have
  • Coverage table, prioritised
  • Gaps classed: process, configuration, enhancement, policy
3 Specification kit

Everything to build, with tests

  • Functional and technical specification for your ECC 6.0
  • Screens, test pack, rollout and run packs
  • Your team or partner builds
4 Conformance review

Built as specified

  • Review against the specification and test results
  • Findings tracked to closure
  • Assurance of implementation as specified, not a legal opinion
No dates or fees on this slide.
Go deeper (full deck): 6.2 6.3 6.4 6.5 6.6
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›18 / 21

Making it right first time: a coverage table, staged release and tests before build

Completeness is shown

Every clause links to a control, a specification item, a test and the evidence; a blank cell is a gap.

Staged release

New suppliers and high-value POs first, then existing-supplier waves, then full scope, with hypercare. Dates set with your team after discovery.

Tests first

Positive and negative cases per control, run on a test system before each stage.

Proposed approach.
Go deeper (full deck): 7.1 7.2
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›19 / 21

Why Attest Know-how: a team that has done this work, inside a bigger platform

Suntech

More than 20 years in the UAE market

An Accredited Service Provider (ASP) for e-invoicing.

Technology

Full-time CTO

Experience at Amazon in transfer pricing and e-invoicing.

Functional

Full-time functional consultant

Chartered Accountant (All India Rank 1); 10 years of SAP; oil and gas; GST in India; 5 years in automation and digital transformation for SMEs in India.

This engagement is a first step into Attest, the Compliance OS for the GCC: one platform for every obligation, who owns it, when it is due and what proof is needed. Today the platform products are demonstrations; know-how consulting is delivered now.
Team profiles are described without names.
Go deeper (full deck): 8.3 8.4
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.ContentsNext section ›20 / 21

Next step: a discovery kick-off with Finance, Tax, Procurement and the SAP and Basis teams

Who we need in the room

  • Group finance and tax leadership
  • Procurement
  • SAP owner, functional and Basis
  • Security and access, as needed

What we will walk through

  • Vendor creation, purchase order and release, receipt, invoice verification, payment run
  • Existing and new supplier flows
  • What is already switched on

What stays with you

  • Your data, in your systems
  • A sample reviewed on your side
  • The documents you choose to share
No fees, dates or commitments on this slide.
Go deeper (full deck): 9.1
Attest Know-how · Prepared for RAK Ceramics · Based on FTA Decision No. 13 of 2026 (in force 1 October 2026); not legal advice; open interpretation points are listed separately.Contents21 / 21